Instructions and operating manuals for Mercury electricity meters. Instructions and operating manuals for electricity meters Mercury Mercury 230 art instruction manual


The energy that is used to power electrical appliances and various types of equipment, as is known, is rapidly becoming more expensive and requires accounting and control of consumption. For this purpose, electricity meters are installed in the premises.

This article will discuss the advantages of using and the characteristics of the Mercury 230 ART 03 meter. However, before you begin to analyze this equipment, you should understand some points.

Which counter to choose

A single-phase electricity meter is installed in a two-wire network with alternating current and a voltage of 220 volts. Three-phase controls flow and takes into account electricity, but operates on the basis of three-wire (and four-wire) networks with a frequency of 50 Hz, with alternating current and a voltage of 380 volts.

A much more complex device is a three-phase meter. It is installed to control energy consumption in industrial buildings, factories, factories and other enterprises where large amounts of electricity are consumed.

If the building does not have a neutral wire, you should take a three-wire meter; if there is a neutral wire, use a four-wire meter.

Three-phase measuring instruments of the Russian company “Mercury” are produced by the well-known company “NKP”Inkotex”. Among the 120 varieties, there are both simple single-phase and the most complex multi-tariff devices, with the ability to control the load and transmit measurements to remote devices.

Some analogues of modifications Mercury 230 ART - 03

  • Mercury 230 ART -00 PQRSIDN — Mercury 234 ART -00 P;
  • Mercury 230 ART -01 PQRSIN — Mercury 234 ART -01 P;
  • Mercury 230 ART -02 PQRSIN - Mercury 234 ART -02 P;
  • Mercury 230 ART -03 PQRSIDN — Mercury 234 ART-03 P.

Multi-tariff unidirectional electronic active-reactive electricity meter of transformer connection Mercury 230 ART -03 CN (R) (230 ART -03 CN - CAN communication interface; 230 ART -03 RN - RS-485 communication interface)

  • Mercury 230 AR -01 CL;
  • Mercury 230 AR -02 CL;
  • Mercury 230 ART -01 CLN;
  • Mercury 230 ART -02 CLN.

Three-phase meter Mercury 230 single tariff

One of the most uncomplicated devices can be called a single-tariff three-phase meter Mercury 230. Such an electrical meter is offered for use by users who have three- or four-wire AC networks.

It works well in conjunction with equipment designed for automatic regulation of electricity. The 230 ART 03 series meter is one of the devices for metering electricity consumption in AC networks. It is used both for savings and convenience.

The operation of electric meters is based on the conversion of signals from current and voltage recording devices into numbers on a liquid crystal screen. Data from such devices can be taken both through direct contact and at a distance using built-in programs.

Application of the Mercury 230 counter

Mercury 230 ART 03 is used both in industry and production, and in everyday life. It can be found in private homes and cottages where electrical appliances operate that consume large amounts of energy, such as boiler rooms, underfloor heating, outdoor lighting and other energy-intensive systems that consume this resource.

Additional tasks

In addition to electricity metering, this device performs many additional configurations, including recording and storing data on used electricity for a specific time period, taking into account the tariff schedule in a multi-tariff mode.

Connecting a multi-tariff or two-tariff mode guarantees cost savings using different tariffs over a 24-hour period. It is not always necessary to use tariff 4; for home needs it is enough to install a two-tariff electricity meter.

Electricity meter design

Elements of the apparatus structure:

  1. Frame.
  2. Contact block.
  3. Protective cover.
  4. Measuring and indicating device.

Features of the device

This resource metering tool is capable of processing data simultaneously at four tariffs, which allows you to save electricity costs at night. The device is equipped with a liquid crystal screen that displays large numbers and therefore will be easy to use for people with poor vision.

The reliability of the accounting tool is indicated by the period of its use - it is 30 years. The interverification interval is 10 years from the date of the previous verification. It is possible to account for forward active energy separately in each phase of the network.

The device operates uninterruptedly at low and high temperatures. The temperature range of use of the device is from -40 to +55, allowing it to be used in the most whimsical and unpredictable conditions, which makes the device multi-directional.

The device allows you to inspect different kinds readings, keep track of forward active and reactive energy for different time periods, record voltage in all phases of the network, set the level of active, reactive and apparent power, control power factors, network frequency and much more.

The presence of an electronic seal will protect the device from unauthorized use for the purpose of stealing electricity by strangers.

Instructions for setting up the Mercury-230-03 counter

They configure the equipment using the “Configurator” program through a CAN-RS232 converter or an optical port, if the device has one.

First, you should set the last three digits of the device number, click “communication test” to check the connection, and receive a notification about the quality of communication on the equipment screen itself.

Any device that has received the request will respond to a network address equal to zero.

After the data exchange has been successfully completed, you need to familiarize yourself with important characteristics about the device - parameters and settings. After entering the second level password in the “connection parameters” window, select the “open” function.

If the device has not been turned on before, set the time and seasonal change on the meter, initialize the power profile and set the integration time for half an hour, then wait a while and allow the program to complete initialization of the profile.

When reading the power profile (the “show” button), you must specify the date and time interval for which the data is needed. After this, you need to set a password for the first access level and check the opening of the communication channel. If the attempt is unsuccessful, the first level password must be obtained from the owner of the equipment.

Additional data provided by the meter

In addition to the above data, you can obtain momentary values ​​of phase powers, each separately and their sum, data on the direction of the total power vector.

You can request effective values ​​of phase currents and voltages, network frequencies, power factors for each phase and for the total sum of phases.

The meter has the ability to set active power limits and turn off the consumed object if the resource acceptance limit is violated.

Device verification and maintenance

According to the instructions, the meter is verified once every 8 years by the State Metrological Service or accredited metrological services of legal entities.

Maintenance work is carried out by employees of the company that operates the meters. Previously, the above-mentioned workers must study the manual for using the device and undergo safety training; these persons must have a safety qualification of at least III.

The warranty period for the meter, according to the instructions, is 36 months from the date the meter was put into operation.

Error e01 on the meter

No matter how high-quality the equipment is, it is exposed to contact with external objects and phenomena that can adversely affect its condition and quality of work. In case of failure or emergency situations, an error code in the format “E-xx” appears on the indicator. Errors include memory malfunction, power limit, and so on.

Error E-01 occurs when the battery voltage is less than 2.2. To fix it, it is recommended to replace the battery.

Conclusion

The Mercury meter has exceptional data accuracy, does not require a high power supply, its calibration interval is 10 years, it is possible to save money according to the tariff schedule, the device has an impressive list of programs that make it possible to manage and monitor the actions of the device. In other words, the device combines the parameters of good quality, durability, multitasking and reasonable cost.

The three-phase meter Mercury 230 is a new release device. This device has telemetry outputs and a special interface designed for information exchange. An electronic seal is installed on the device, the device can automatically diagnose various faults. The manufacturer of electricity meters is the company "NPK Incotex".

Device Description

The Mercury 230 direct-flow meter is installed for metering electricity in three-wire and four-wire networks. The device can be connected either directly or using a transformer method. If you connect a transformer to the device, then it will be possible to take into account electricity at sites with high loads.

The device, which has three phases, has a liquid crystal display. Data in kilowatt-hours appears on this screen. The display has 8 digits. The first 6 digits show whole kW/h values, the last 2 digits show decimal places, hundredths of kW/h. The error in the readings of this device is 1.0. The devices are installed indoors, where the air temperature can be -40…+55ºC.

If the device is connected through a transformer, then it is possible to measure a current greater than that for which the device is designed. Meters are installed in the domestic and industrial sectors. Household appliances are placed in residential buildings. Industrial devices are used in the industrial sector, in factories, factories and factories. Counters are induction and electronic. Electronic ones have a high quality certificate, are more accurate, they do not have rotating parts and convert the signal that comes from the measuring elements.

Specifications

The Mercury 230 electronic meter is distinguished by increased accuracy and high reliability. The minimum operating time is 150 thousand hours. The operating life of the device is 30 years. The verification period for electric meters (verification interval) is 10 years. The warranty period is 3 years from the date of manufacture.

Specifications:

  1. The rated current for the transformer connection is 5 A.
  2. The basic current when connecting the device directly is 5 A or 10 A.
  3. The highest current rating is 60 A.
  4. The phase voltage indicator is 230 V.
  5. Frequency - 50 Hz.
  6. 2 pulse output modes: main, testing.
  7. The permissible error limit of the device belongs to accuracy class 1.
  8. Dimensions, dimensions: 258x170x74 mm.

When there is no current in the series circuit, the test output of the device when measuring active and reactive energy does not create more than one pulse per 10 minutes. These devices have increased strength and reliability. Previously, they were installed at manufacturing plants. Now they are often used when wiring electricity in country houses. This is explained by the presence of a large number of electrical household appliances that require high electrical power.

Basic and additional functions

Nowadays, electric meters, in addition to the main function of metering electricity, have various additional properties, with the help of which it is possible to control some characteristics of the electrical network and the modes of the device itself. You can take data from this device not only on site, but also remotely through some types of interface. The two-tariff Mercury meter is a device that has increased capabilities.

Standard connection options for a three-phase meter Mercury 230:

  1. Measuring electricity data, storing it and visualizing it on the display for the following time interval: from the last reset, for 24 hours, for 30 days, for a year.
  2. The device can take into account current according to two tariff plans for 16 time zones.
  3. The device can be programmed every month to a new tariff.

The device records the following characteristics:

  • instant power calculation;
  • determination of potential difference;
  • current determination by phases;
  • network frequency indicator;
  • power by different phases and general.

The device has maximum protection. If the limit is exceeded, the device notes this and also indicates exact time when the excess occurred. The digital output allows you to control the load.

The device has an event log. It indicates the following indicators:

  • time of connection of the device to the network and disconnection from it;
  • phase accounting;
  • correction of the tariff schedule;
  • accounting for meter opening;
  • exceeding the limit.

Let's consider additional features device. The counter has additional functions:

  • electricity metering in forward and reverse directions;
  • it is possible to transmit electricity consumption data for each phase;
  • Availability of power data archive with intervals from 1 to 45 minutes;
  • The archive data storage period is 85 days;
  • the highest rate of morning and evening power;
  • loss accounting;
  • accounting for magnetic influence with recording of data in a special journal;
  • power quality control.

Connection diagram

Let's look at how to connect the device. You can connect the meter using different schemes, in them current transformers will be used as a data source. Here is a diagram for connecting the Mercury 230 meter. The most common is the ten-wire connection diagram for the device. Its advantage is the presence of power circuits and measuring instruments. The disadvantage is the large number of wires.

The sequence of connecting the meter and transformer:

  • terminal 1 -- input A;
  • terminal 2 -- input of the end of the measuring winding A;
  • terminal 3 - output A;
  • terminal 4 -- input B;
  • terminal 5 -- input of the end of measurement winding B;
  • terminal 6 -- output B;
  • terminal 7 -- input C;
  • terminal 8 -- winding end input C;
  • terminal 9 -- output C;
  • terminal 10 -- zero phase input;
  • terminal 11 - zero phase on the voltage side.

To install the meter in a transformer circuit break, use terminals L1 and L2. You can connect the meter using a semi-indirect circuit. In this case, the current transformers are connected in a star. This makes installation of the device easier and fewer wires are needed. The accuracy and quality of the data is not degraded.

A seven-wire CT connection method is also used. Its disadvantage is the lack of galvanic isolation of circuits. This scheme is considered dangerous to use and is now almost never used.

Connecting the Mercury 230 electric meter has much in common with installing a single-phase device. But there are also many differences when installing the installation. The connection diagram is available on the meter body, on the back of the cover.

When installing, you must follow the color sequence. Even wire numbers correspond to the load, odd wire numbers correspond to the input. Connection diagrams for a three-phase multi-tariff meter are used.

When the meter is connected to three-phase consumers, the process is carried out through current transformers. This scheme makes it possible to reduce the cost of electricity and increase the reliability of its supply. Direct connection meters do not make more than 100 A. This is due to the limitation of conductor sizes. The higher the current, the larger the cross-section of the wire required to pass it. Current transformers eliminate such limitations.

Let's consider the diagram for connecting the meter through a test terminal box: the terminals in the block are designated by the letters A, B, C. A wire comes to these terminals, which is connected to the 380 V power buses, and then goes to the meter through jumpers.

If necessary, the jumpers are untwisted, moved, and the chain is broken. This will relieve the mains voltage and ensure safe operation of the device connected to the test box. The IKK has a protective cover and a device for a seal, a screw with a hole. The seal is installed together with the installation of the meter.

Let's look at how to take readings from an electricity meter. The device has a 6-digit dial. You need to write down all the numbers up to the decimal point. To calculate energy consumption for a month, you need to subtract from the new readings those that were last month.

Let's find out how to take readings from a multi-tariff meter (article Mercury 230 ART-01). To do this, you need to record the following data: T1 - current consumption during the day, T2 - current consumption at night. Before recording data, you must make sure that the device is in ready mode.

There should be a line near mark A. If it is not there, then press the right button. Then press the Enter button. In this case, the display will indicate current consumption data during the day T1. Press Enter a second time and rewrite the value of T2 (at night).

Modifications

There are such modifications of Mercury meters:

  1. Single-tariff three-phase, multi-tariff and multifunctional: Mercury 230 ART, Mercury 231 AT.
  2. Three-phase active and reactive electrical energy, single tariff, article number: Mercury 230 AR.
  3. Three-phase active energy single tariff: Mercury 230 AM, Mercury 231 AM.
  4. Single-phase active energy single-tariff and multi-tariff: Mercury 200, Mercury 202, Mercury 201.

The SIKON controller is installed in Mercury meters with active and reactive energy with an internal tarifficator; the devices can be bidirectional or unidirectional.

Mercury counter 230 is intended for metering all types of electrical energy in three-phase networks. It is two-tariff. Current measurement occurs via a transformer. Has the ability to transmit information through an interface via digital communication channels. It is used both in domestic buildings and in industrial enterprises and agricultural facilities. It is used both independently and in the scheme of systems for technological and commercial calculation tools.

Standard features of Mercury 230 (two-tariff)

  1. Measuring and storing data on consumed electricity, as well as its visualization on the display for the following time periods:
    • From last reset;
    • Within 24 hours;
    • Within 30 days;
    • For the current year;
    • For the last year.
  2. The ability to meter electricity according to two tariff plans, for four types of days and 16 time zones.
  3. Ability to program monthly according to a new tariff schedule;
  4. Recording the following parameters:
    • Instant calculations of any capacity;
    • Actual parameters of potential difference, phase current, angles between phases;
    • Electrical network frequency;
    • Power factors separately by phase and in total.
  5. Protection control is carried out (maximum). There is a way to set the maximum allowable load power limit. If this limit is exceeded, the counter makes a note indicating the exact time value when the excess occurred.
  6. The load can be controlled via a digital output.
  7. The presence of event logs, the following values ​​are recorded in it:
    • The time when the meter was connected to/disconnected from the network;
    • Disappearance and appearance of phases;
    • Closing and opening the device;
    • Correction of tariff schedule;
    • Exceeding limits.

Additional counter features

Based on the modification, the device has additional functions:

  • Forward and reverse metering of electricity;
  • Energy metering for each phase;
  • Saving an archive of received capacities at step-by-step intervals from 1 to 45 minutes. The archive storage time reaches 85 days;
  • The maximum value of morning and evening power is recorded;
  • Current quality is monitored;
  • Losses and magnetic influence are taken into account - an entry is made in the log.

Characteristics of Mercury 230

Technical data of the electricity meter Mercury 230

Metering device accuracy class 0,5 – 1
Interface RS-485, CAN, IrDA, PLC-I
Power supply from UPS Eat
Number of pulse outputs 2
Self-diagnosis Eat
Presence of a seal (electronic) Yes
Parameter transfer protocol Open
Dimensions 260x170x75
Weight, kg 1,5
Working temperature — 40 + 55 C
Testimony protection 2 access levels
Storage time of readings, years 40
Operating frequency 50 Hz
Bit depth 000000,0

Life time

The service life of the three-phase electricity meter Mercury 230 is 30 years (with proper operation under normal conditions environment). The manufacturer provides a 3-year warranty. MTBF (average value) – 150 thousand hours.

Calibration interval

The interval between verifications of this Mercury is 230–10 years. Verification is carried out by a special accredited organization or the manufacturer of this device.

Meter Mercury 230, instructions for taking readings

The display shows visual parameters: date and time (current values), frequency of the measured network, total power factor, as well as separately for all phases, maximums - morning and evening, current and voltage value at a given time, consumption of active and reactive electricity, accuracy - up to hundredths of kW/h.

To take readings, you need to select the electricity metering tariff you are interested in by time of day:

  • T1 – day;
  • T2 – night.

Then multiply the value to a decimal point by the cost of the tariff, add the two resulting numbers and pay.

Installation of an electric meter, connection diagram

To connect the device, a semi-indirect circuit is selected. This makes it possible to measure electricity from consumers over 60 kW. The peculiarity of this connection is that the primary winding of the transformer is replaced by an electric wire. To calculate electrical energy, you need to take the product of the transformation ratio and the meter readings.

Meters of this model are currently being produced. The price for Mercury 230 starts from 2300 rubles.

Product in stock!

Conditions for ordering and delivery of adapters for communication with Mercury meters
(requests by email [email protected] or by phone 8-909-283-34-16)


1) Cost 6000 rubles. Buy. Miniature SPD for polling lists of Mercury meters via any of the connected USB-RS485/CAN/IRDA/optoport interfaces. It can independently poll 10 three-phase Mercury meters, or create an end-to-end tunnel through itself for polling by external programs of an unlimited list of meters.

2) Ethernet-RS485 (VR-008.1) Cost 3600 rubles. Buy. A complete hardware device for transmitting data between an Ethernet local network and a wired RS485 interface. Widely used to automate readings from metering devices, including Mercury electricity meters. Works with all types of TCP/IP protocols in server and client modes. Can be connected to the Internet for remote monitoring of ASKUE metering objects.

3) USB-IRDA (model VR-001) Cost 1950 rubles. Buy. Interface converter for electricity meters Mercury-230, 231, CE-102 containing IRDA interfaces. To connect to an electric meter, it does not require opening the terminal box.

4) USB-RS485/CAN (model VR-002) Cost 1950 rubles. Buy. Universal converter of wired interfaces RS485/CAN. Can supply power to the electric meter interface. Suitable for Mercury-200, 203.2T, 206, 230, 233, 234, 236 containing RS485/CAN. Connection requires opening the terminal box. It is possible to connect highways with meters.

5) USB-RS485 (model VR-004) Cost 850 rubles. Buy. Suitable for Mercury electricity meters that do not need to power the communication interface. It has only output terminals D+ and D-. Can be used with Mercury-203.2T, 206, 230, 233, 234, 236, containing RS485. It is necessary to open the terminal box for connection.

6) USB optical port (model VR-005) Cost 1950 rubles. Buy. Suitable for electricity meters Mercury-201.8TLO, 203.2T, 206, 233, 234, 236, containing an optical port. Connection does not require opening the terminal box.

8) JTT-A (RS485/CAN) (433 MHz radio modem, 100 mW) Cost 4000 rubles. Buy. Miniature radio modems with a transparent communication channel, allowing you to work with electricity meters in radio extender mode. They have the ability to connect to industrial RS485/CAN interfaces and allow you to create group or single electricity metering units in hard-to-reach places.

9) Automation unit - WiFi router (model VR-007.3) Cost 5000 rubles. Buy. A smart home element that allows automated polling of a three-phase Mercury meter through any of the connected USB-RS485/CAN/IRDA/optoport interfaces. It has its own adaptable Web interface, a database, and can conduct a minute-by-minute survey of instantaneous values ​​of currents, voltages, powers, and build energy graphs by month and day. It has the ability to broadcast a webcam and weather stations through itself; it is an element of a smart home capable of transmitting consumption data to email user and sales. Can output data to the Narodmon.ru server and report critical situations.




Delivery (added to the cost of the product):

1) Russian Post - first class registered parcel. Price 300 rubles. Delivery time is 3-5 working days. A track number is issued.

Product in stock!

Conditions for ordering and delivery of adapters for communication with Mercury meters
(requests by email [email protected] or by phone 8-909-283-34-16)


1) Cost 6000 rubles. Buy. Miniature SPD for polling lists of Mercury meters via any of the connected USB-RS485/CAN/IRDA/optoport interfaces. It can independently poll 10 three-phase Mercury meters, or create an end-to-end tunnel through itself for polling by external programs of an unlimited list of meters.

2) Ethernet-RS485 (VR-008.1) Cost 3600 rubles. Buy. A complete hardware device for transmitting data between an Ethernet local network and a wired RS485 interface. Widely used to automate readings from metering devices, including Mercury electricity meters. Works with all types of TCP/IP protocols in server and client modes. Can be connected to the Internet for remote monitoring of ASKUE metering objects.

3) USB-IRDA (model VR-001) Cost 1950 rubles. Buy. Interface converter for electricity meters Mercury-230, 231, CE-102 containing IRDA interfaces. To connect to an electric meter, it does not require opening the terminal box.

4) USB-RS485/CAN (model VR-002) Cost 1950 rubles. Buy. Universal converter of wired interfaces RS485/CAN. Can supply power to the electric meter interface. Suitable for Mercury-200, 203.2T, 206, 230, 233, 234, 236 containing RS485/CAN. Connection requires opening the terminal box. It is possible to connect highways with meters.

5) USB-RS485 (model VR-004) Cost 850 rubles. Buy. Suitable for Mercury electricity meters that do not need to power the communication interface. It has only output terminals D+ and D-. Can be used with Mercury-203.2T, 206, 230, 233, 234, 236, containing RS485. It is necessary to open the terminal box for connection.

6) USB optical port (model VR-005) Cost 1950 rubles. Buy. Suitable for electricity meters Mercury-201.8TLO, 203.2T, 206, 233, 234, 236, containing an optical port. Connection does not require opening the terminal box.

8) JTT-A (RS485/CAN) (433 MHz radio modem, 100 mW) Cost 4000 rubles. Buy. Miniature radio modems with a transparent communication channel, allowing you to work with electricity meters in radio extender mode. They have the ability to connect to industrial RS485/CAN interfaces and allow you to create group or single electricity metering units in hard-to-reach places.

9) Automation unit - WiFi router (model VR-007.3) Cost 5000 rubles. Buy. A smart home element that allows automated polling of a three-phase Mercury meter through any of the connected USB-RS485/CAN/IRDA/optoport interfaces. It has its own adaptable Web interface, a database, and can conduct a minute-by-minute survey of instantaneous values ​​of currents, voltages, powers, and build energy graphs by month and day. It has the ability to broadcast a webcam and weather stations through itself, and is an element of a smart home capable of transmitting consumption data to the user’s email and sales. Can output data to the Narodmon.ru server and report critical situations.




Delivery (added to the cost of the product):

1) Russian Post - first class registered parcel. Price 300 rubles. Delivery time is 3-5 working days. A track number is issued.

Editor's Choice
What they were looking for on the page: Technosphere safety courses: labor protection. Technosphere safety and labor protection. Specialist in the field...

The Pushkin Institute is known in the world as one of the best universities where Russian teachers are trained, a center for creating new teaching methods...

For more than 85 years, Bryansk has been producing qualified specialists. Its history began back in 1929. At that time the university was...

Anxiety is a child of evolution. Anxiety is a feeling familiar to absolutely every person. Anxiety is based on the instinct of self-preservation, which...
Both the dispersion medium and the dispersed phase can be composed of substances in different states of aggregation. Depending on the...
Seeing your deceased father or grandfather, mother or grandmother alive in a dream means getting rid of difficulties and problems. Seeing living loved ones...
The separative Ъ is written after consonants before the letters Ya, Yu, Yo, E, conveying combinations [j] with vowels, in the following cases. 1....
D. Shostakovich. 10th Symphony, Part I S. Prokofiev. 8th Sonata, Part I The depth of the concept is due to the fact that the tonal structure of the reprise...